Category Archives: wildlife shelters

Australian Story- Our wildlife needs more funding!

Australia is a very prosperous country. Many Australians are making vast amounts of money from the mining industry, forestry, housing and investments. Money should be put towards our iconic wildlife, the same wildlife that brings in billions of tourist dollars every year. They are also integral to our biodiversity and the health of the land and our people.

 

They are being betrayed, not funded, burnt alive, have their habitat and homes cleared, they are culled and killed on the roads and gobbled up by feral and domestic non-native animals.

 

They deserve better, they don’t need a lot of money, but the impacts that they endure because of us humans should be compensated in some way to mitigate their suffering.

 

This wonderful Australian Story illustrates the need for all Australians to step up and make change.

 

http://www.abc.net.au/austory/call-of-the-wild/9008974

Share This:

AWPC – Melbourne Water correspondence on tree removal wildlife-impact Lee st Retardant Basin

AWPC writes that only two of its questions were answered satisfactorily. It asks Melbourne Water what happens to the wildlife after the clearing? “The AWPC, wildlife rescuers and shelters regularly experience the fallout of such projects. Consultants and wildlife handlers are contracted at a premium price, only to hand over displaced, orphaned and injured wildlife to either vets or local wildlife shelters who are then expected to deal with these sentinel beings at their own cost. Quite frankly this is unacceptable and needs to stop, which is why the AWPC ask you the following questions once again.” Inside, full correspondence to date.

 

Craig Thomson
President, Australian Wildlife Protection Council
502 Waterfall Gully Road, Rosebud 3939
craig.awpc@gmail.com
0474 651 292

Mark Lawrence
Melbourne Water Project Manager
990 La Trobe Street Docklands VIC 3008
PO Box 4342 Melbourne VIC 3001
rbupgrades@melbournewater.com.au

Dear Mr. Lawrence,

Re: your response to my email sent 23/1/2018 about the ‘Lee St Retarding Basin Upgrades’

Overall, it was a very disappointing response, especially as most of your answers are already available on your community information sheet. Only two questions were answered satisfactorily; were you confirmed that you have forwarded my query about the sale of Melbourne Water land to the relevant department and the dates of the pre-fauna survey. We have spent a great deal of time putting these questions to you because of the lack of information provided by Melbourne Water to concerned members of the community.

Is Melbourne Water concerned about genuine community consultation and being transparent to the community to whom they provide an essential service? The Australian Wildlife Protection Council (AWPC) will be putting in a Freedom of Information request for the documents you have not supplied, including the ecological/fauna reports, however we will also complain to the concerned ministers, local councilors and community members about Melbourne Water’s lack of openness and communication. We believe you are scaring the community to justify these works whilst refusing to be transparent about the true risks. This is highlighted in your reply, by the following text, coupled with the fact that you are asking us to then submit an FOI for proof of this.

“Failure of the embankment would have a significant impact on a number of properties in the area.”

As you have identified, we are particularly concerned about the impacts on wildlife with the removal of vegetation; of the fifteen questions we sent to you eight are about wildlife. We ask Melbourne Water what happens to the wildlife after the clearing? The AWPC, wildlife rescuers and shelters regularly experience the fallout of these projects. Consultants and wildlife handlers are contracted at a premium price, only to hand over displaced, orphaned and injured wildlife to either vets or local wildlife shelters who are then expected to deal with these sentinel beings at their own cost. Quite frankly this is unacceptable and needs to stop, which is why the AWPC ask you the following questions once again:

1. Which wildlife rescue groups, wildlife shelters and vets have been contacted to look after or treat any injured wildlife?
2. Do local wildlife shelters have the capacity to look after injured wildlife during this busy time of the year?
3. What arrangements have been made to financially compensate these groups?
4. What measures have been taken to install nest boxes or other artificial habitat for displaced wildlife? (Please note that installation of nest boxes needs to be carefully planned in advance so as to enable wildlife to be bonded to new nests before re-release).
5. Do the contracted ‘wildlife handlers’ have appropriate wildlife handling experience as well as knowledge of the legislation about the re-location of wildlife.
6. Do the ‘wildlife handlers’ possess the appropriate permits to have protected wildlife relocated within a safe distance from their habitat loss or will animals be euthanased?

If Melbourne Water maintain, “Protection of wildlife is of great importance to Melbourne Water and we have committed to implement the handler’s recommendations” does Melbourne Water also commit to answering our questions for the ongoing protection of wildlife who will be effected by this project?

We can only assume, from your response, that the only community engagement so far planned by Melbourne Water, is to provide wood from the felled trees to various groups to make furniture. Yet, the community groups who will be most effected like environmental groups, wildlife rescuers, wildlife carers and shelters have not been included in this process what so at all!

To indicate that you are only going to plant 30 canopy trees within Frankston, in a place yet to be identified, does not seem to be fair compensation for the loss to the local environment. How did Melbourne Water come to this conclusion? Are these trees to be planted by community volunteers or are there to be separate plantings by contractors? The AWPC has identified a number of suitable sites close by, owned by Melbourne Water for these plantings.

We look forward to your reply and answers to our questions and we at the AWPC are happy to consult with Melbourne Water and/or your ecologist consultants to work on a better plan, communication and management for the future of this project.

Yours sincerely,

Craig Thomson
President, Australian Wildlife Protection Council

LETTER TO PRESIDENT CRAIG THOMSON FROM MARK LAWRENCED, MELBOURNE WATER PROJECT MANAGER

Mr Craig Thomson
President
Australian Wildlife Protection Council Inc.
craig.awpc@gmail.com

Dear Mr Thomson
Thank you for your email enquiry regarding safety upgrade works at the Lee Street Retarding
Basin in Frankston.

We understand that you are concerned with the planned tree removal at the site and the
impact this may have on wildlife and their habitat.

Under Melbourne Water’s Statement of Obligations (2015) issued by the Minister for Water, we
are required to assess all existing retarding basins against the Australian National Committee
of Large Dams (ANCOLD) Guidelines. An assessment of the Lee Street Retarding Basin against
these guidelines identified that the site does not comply and safety upgrade works are required
to continue to reduce flood risk for the local community.

To ensure Lee Street Retarding Basin continues to operate safely and comply with the ANCOLD
guidelines, trees and vegetation on the length of the embankment will need to be removed as
part of the works. We have worked hard to ensure that we only remove trees that will affect
the integrity of the retarding basin and have committed to planting trees at other locations in
the Frankston City Council area.

The ANCOLD guidelines are publically available and a copy can be purchased online from
ANCOLD at their website: www.ancold.org.au The guidelines do not specifically mention trees
on retarding basin embankments. They provide guidance on how to assess risk on dams and
dam-like structures.

In the past, it was common practice to have trees on retarding basin embankments. However,
as international understanding of dam engineering has improved it has become evident that
trees significantly weaken embankments and increase the risk of failure in a high rainfall
event. Failure of the embankment would have a significant impact on a number of properties in
the area.

In 2015, Melbourne Water received independent specialist advice that trees on retarding basin
embankments increase the chance that the embankment may fail in the event of a large rain
event. The chance is increased due to:

 internal erosion and displacement of soil – tree roots create erosion pathways
through the embankment which are worsened when the tree dies and its
decaying roots leave voids through the embankment;

 trees uprooting and taking part of the embankment with them; and

 water speeding up around tree trunks and causing faster erosion.

As part of the works, the embankment must also be hardened to operate safely and this can’t
be done without the trees being removed.
We understand the importance of trees to the local community and have committed to
mitigating the impact of removing the embankment trees by:

 planting 30 canopy trees elsewhere in the Frankston City Council area;

 using the cut-down logs to provide a woodland habitat for wildlife at Lee Street
Retarding Basin; and

 recycling the cut down logs to make furniture that will be donated to Frankston
City Council.

A reinstatement plan has been developed in adherence to Frankston City Council’s Local Law
22 permit requirements and we will implement it in the coming months. In addition to the
reinstatement plan, wood from the trees at the site will be utilised by a local community group
and the community will also have an opportunity to participate in a planting day in Frankston
in coming months.

As part of the planning for the project, Melbourne Water engaged specialists to complete a
flora and fauna assessment and arborist assessment as part of Council’s requirements under
Local Law 22.

In your email you asked us to provide you with the arborist report and water depth and flood
modelling records. We ask you to request these under the Freedom of Information Act 1982
(Vic) to make an FOI request, please visit our website and use the online FOI application:

www.melbournewater.com.au Our FOI Officer, Michael Keough, is available to assist with your
application if required. Michael can be contacted on 9679 6821 or at
foi@melbournewater.com.au

In addition to the flora and fauna assessment we have engaged a wildlife handler who will
manage and implement the wildlife management practices prior to and during the tree removal
activity. Protection of wildlife is of great importance to Melbourne Water and we have
committed to implement the handler’s recommendations including:

 undertaking a pre-construction visual inspection and assessment at Lee Street retarding
basin. This was completed on 29 January 2018 and found no EPBC Act-listed threatened
ecological communities or FFG Act-listed threatened flora communities present within the
Lee St study site.

 marking trees that have possible habitat to ensure that they are removed appropriately.

 confirming the species as listed in the flora and fauna assessment

 remaining onsite during the tree removal works to check and safely move fauna prior to
tree removal.

The wildlife handler we have engaged is a qualified ecologist and zoologist with 25 years’
experience.

The EPA guidelines referred to are in relation to hours of work. Work for this project will be
carried out in line with EPA guidelines between 7am and 6pm Monday to Friday and 7am and
1pm on Saturdays.

Your email included concern at the sale of Melbourne Water land in the Frankston area and the
potential loss of biodiversity. We have passed this on to our Property Team who will respond to
you direct.

Once again, thank you for your email.

Yours sincerely,
Mark Lawrence
Melbourne Water Project Manager

 

ORIGINAL LETTER FROM CRAIG THOMSON TO MELBOURNE WATER ABOUT REMOVING TREES FROM LEE ST RETARDANT BASIN

Letter from Craig Thomson, President AWPC
Dated 23 January 2017.

Subject: Lee st Retarding Basin Frankston

Addressed to: David.Fairbridge@frankston.vic.gov.au (Biodiversity Officer at Frankston Council), lisa.neville@parliament.vic.gov.au (Minister for Police and Water) rbupgrades@melbournewater.com.au (email address for Melbourne Water retardant basin upgrades).

The Australian Wildlife Protection Council understands and recognise the needs to protect our communities from potential danger. We are also aware that the removal of vegetation has an impact on wildlife species. In fact it is a guarantee that wildlife will be killed during works that clear vegetation. As such we expect that every possible measure is undertaken to see if in fact clearing is necessary and if so that appropriate actions are taken and that local wildlife shelters are not left too pick up the pieces of poor planning.

We have received concern from the local community members that the threat of flooding to the local community at the Lee St retarding basin has not deemed a risk in the past and believe the proposed clearance of vegetation is excessive and will have significant impact on fauna as well as other issues, particularly of erosion and dust as well. So the Australian Wildlife Protection Council would greatly appreciate if you could answer the following questions;

-What pre-fauna surveys have been carried out and when?

-What species have been identified on site?

-What are the actions have been put into place for fauna pre, during and post construction activities for fauna?

-Which wildlife rescue groups, wildlife shelters and vets have been contacted to look after or treat any injured wildlife?

-What arrangements have been made to financially compensate these groups?

-Do local wildlife shelters have the capacity to look after injured wildlife, as they could be attending to heat stress events or bushfire effected wildlife?

-What measures have been taken to install nest boxes or other artificial habitat for displaced wildlife?

-Do they have appropriate wildlife handling permits as well as permits to have protected wildlife euthanised if injured or unable to relocate wildlife in a safe distance from their habitat loss?

-What community groups have they contacted to work with as stated in their community information sheet?  [Ref: ] “We understand the importance of trees to the local community and are committed to working closely with council, residents and community groups to develop an appropriate plan for reinstatement of trees else where in the area” in the information document provided for this project https://www.melbournewater.com.au/sites/default/files/2018-01/Communitybulletin-LeeStreet.pdf

-Where are other trees being planted, what species are to be planted and how many?

-Are offsets being provided?

-Is there an arborist report of the trees health?

-Can records of water depth be provided for the Lee St retarding basin to show threat of flooding to neighbouring properties over the years of its existence?

-Can modelling or records be provided of local flooding for once in a 40+ year storm event?

-What are the EPA regulations you are keeping to with to for this project?

-Can you provide a copy of the ANCOLD guidelines?

The Australian Wildlife Protection Council also has the understanding that you are in the process of selling off land on McClelland Dve to Ambulance Victoria for an ambulance station and another permit application has been made by Log Cabin Caravan Park. In fact we believe that all land owned by Melbourne Water from Skye Rd to Frankston/Cranbourne Rd is being considered surplus land by Melbourne Water. So it appears there are several sites across the Frankston city council municipality owned by Melbourne Water that poses a potential loss of biodiversity.

So the final question we have to you is what is Melbourne Water’s commitment to biodiversity in Frankston?

 

Share This:

AWPC Complains to Members of Parliament re Melbourne Water rush project & wildlife impact

To Lisa Neville, Lily D’Ambrosio, Paul Edbrook:
Good morning Honourable members of parliament,

Official complaint against Melbourne Water retarding basin upgrades.

I am sending you this email this morning in regards to Melbourne Water’s retarding basin upgrade in Lee St Frankston. Melbourne Water have used a very short period of time to communicate with the community about this project.

The way they have proceeded has not been open and transparent, they have used excuses of potential danger to the community without backing these claims with scientific data. When they have been approached to do so, they have communicated that we need to put in a freedom of information request (which we are in the process of doing).

We have no issues in improving infrastructure that will improve efficiency and safety to the community, as long as it is done in the guidelines of the law that does not have a negative impact on the environment, community groups and the community.

It would seem to us and members of the broader community in Frankston (who have expressed concern about wildlife welfare) are concerned with the rush to undertake this project and lack of transparency. which may in fact lead to breaches of the law and impact wildlife, local wildlife shelters. As such the Australian Wildlife Protection Council is filing this as an official complaint to you against Melbourne Water. Attached is correspondence of this project to date.
[For correspondence see “AWPC TO MELBOURNE WATER RESPONSE ON TREE REMOVAL LEE ST RETARDANT BASIN”

Share This:

Emergency Wildlife Bush Fire Relief- Surf Coast Animal Rescue Services

Surf Coast Animal Rescue Services is urgently raising funds (generously auspiced by Winged Horse Equine Inc) to attend to the needs of wildlife affected by the Christmas Day Lorne/Wye River bushfires in Victoria, Australia, which has hit hardest in one of the most densely populated wildlife areas in the Otway Ranges, also home to one of few Victorian koala populations.

surf-coast-fundraiser

Millions of native animals have perished, with many thousands more injured and needing immediate attention. The worst of the fires are now contained, but emergency services have warned these fires could last for weeks and flare up again over what is forecast to be a hot, dry summer with record breaking temperatures.

As the centre of the bushfire zone is opened up in coming days, hundreds of native animals will require rescuing and we anticipate that the rescue efforts will continue for weeks, perhaps months. We are seeking assistance for the purchase of medical equipment, fire-suitable rescue gear, transportation costs, professional veterinary costs, species-specific burn creams and bandages. These items are required urgently and all donations, no matter the size, are most welcome. We are also hoping to provide wildlife rescue kits to all our active volunteers so that no animal is left without the immediate care they require.

We are a volunteer organisation with volunteers who have been rescuing wildlife in the Surf Coast region for 25 years.

By supporting us, you help us to:

– provide immediate veterinary care to injured wildlife

– transport wildlife out of the fire zones

– provide ongoing rehabilitation of wildlife until they are ready to be returned to the wild

– place orphaned wildlife in long-term foster care

– supply wildlife rescuers with efficient wildlife rescue kits

– supply wildlife carers with ongoing medical supplies

– provide public awareness and educational programs specific to the rescue of wildlife in the region.

Donate generously and thank you for your support

GIVE NOW- CLICK HERE

Share This:

Kangaroo cull approved for next to the Carlisle River Wildlife Shelter

Carlisle River Wildlife Shelter’s Ron and Carola Anstis are heartbroken to learn animals they had spent years caring for were being shot dead thanks to approval from the State Government.

Embedded conflicts of interests exist within the State government because they have responsibilities for both administering the Wildlife Act, to protect native species, AND for administering permits to kill them! (Authority to Control Wildlife permits).

They are the only wildlife shelter in the area that cared for Eastern Grey Kangaroos, between Geelong and Warrnambool, and that’s a big area. However, the area is too small to share with wildlife, and some narrow-minded people still want to access firearms, and kill them. The Anstises take in pouch young we care for them for about two years and spend more than $1000 on each.

Ron Anstis said “we just told the department we can’t put that much into it only for them to allow someone else to kill it. This is the same department that issue us our wildlife licence.” So the same Government Department, (Department of Environment, Land, Water and Planning- DELWP), that issues wildlife licences, is the same department that issues killing permits.

Ron and Carola have no ability to fight that permit what so ever, and there is no appeals process to allow residents to dispute cull permits where required.

babyjoey2

The Department admits they have no data or records on how many native animals in Victoria, of most species, except for anecdotal evidence.

The government officer was satisfied that the landholder had explored available nonlethal management measures, such as maintenance and improvement to boundary fencing, prior to applying for the ATCW. “The officer also confirmed that the kangaroos were causing damage to pasture from overgrazing….” Wonder if they’ve assessed if it’s been “overgrazed” from overstocking of livestock and/or feral animals?

Two rabbits eat the same amount as a kangaroo and a cow with a calf at foot will eat as much as 30 kangaroos; DELWP should be required to explain to the applicant the dietary differences between kangaroos and cattle so that the applicant can be properly informed about the amount of competition for pasture that actually exists,” Mr Anstis said.

The couple left a rescued joey at government office in protest over a kangaroo cull permit at their neighbour’s property.

The Anstises were forced to leave eight-month-old Angel at the Department of Environment, Land, Water and Planning offices in Colac on Tuesday. Anstises had decided to stop rescuing and rehabilitating joeys and injured eastern grey kangaroos because of the contradictory action by DELWP of giving their neighbour permission to legally cull 60 roos! The neighbours want to improve their pastures, the cheap way.

The couple, with 23 years of experience in wildlife care, is calling for state government change that would see exclusion zones around wildlife shelters to prevent the allocation of culling permits.

Victoria, the most cleared and damaged State, has lost it’s balance, and has no place for EGK! Livestock, infrastructure, land clearing, roads, urbanisation and liberal distribution of ATCW means these iconic native kangaroos are doomed to be left to die, if found as joeys, in the large area of Victoria that the Anstises served.

Share This: