AWPC – Melbourne Water correspondence on tree removal wildlife-impact Lee st Retardant Basin

AWPC writes that only two of its questions were answered satisfactorily. It asks Melbourne Water what happens to the wildlife after the clearing? “The AWPC, wildlife rescuers and shelters regularly experience the fallout of such projects. Consultants and wildlife handlers are contracted at a premium price, only to hand over displaced, orphaned and injured wildlife to either vets or local wildlife shelters who are then expected to deal with these sentinel beings at their own cost. Quite frankly this is unacceptable and needs to stop, which is why the AWPC ask you the following questions once again.” Inside, full correspondence to date.

 

Craig Thomson
President, Australian Wildlife Protection Council
502 Waterfall Gully Road, Rosebud 3939
craig.awpc@gmail.com
0474 651 292

Mark Lawrence
Melbourne Water Project Manager
990 La Trobe Street Docklands VIC 3008
PO Box 4342 Melbourne VIC 3001
rbupgrades@melbournewater.com.au

Dear Mr. Lawrence,

Re: your response to my email sent 23/1/2018 about the ‘Lee St Retarding Basin Upgrades’

Overall, it was a very disappointing response, especially as most of your answers are already available on your community information sheet. Only two questions were answered satisfactorily; were you confirmed that you have forwarded my query about the sale of Melbourne Water land to the relevant department and the dates of the pre-fauna survey. We have spent a great deal of time putting these questions to you because of the lack of information provided by Melbourne Water to concerned members of the community.

Is Melbourne Water concerned about genuine community consultation and being transparent to the community to whom they provide an essential service? The Australian Wildlife Protection Council (AWPC) will be putting in a Freedom of Information request for the documents you have not supplied, including the ecological/fauna reports, however we will also complain to the concerned ministers, local councilors and community members about Melbourne Water’s lack of openness and communication. We believe you are scaring the community to justify these works whilst refusing to be transparent about the true risks. This is highlighted in your reply, by the following text, coupled with the fact that you are asking us to then submit an FOI for proof of this.

“Failure of the embankment would have a significant impact on a number of properties in the area.”

As you have identified, we are particularly concerned about the impacts on wildlife with the removal of vegetation; of the fifteen questions we sent to you eight are about wildlife. We ask Melbourne Water what happens to the wildlife after the clearing? The AWPC, wildlife rescuers and shelters regularly experience the fallout of these projects. Consultants and wildlife handlers are contracted at a premium price, only to hand over displaced, orphaned and injured wildlife to either vets or local wildlife shelters who are then expected to deal with these sentinel beings at their own cost. Quite frankly this is unacceptable and needs to stop, which is why the AWPC ask you the following questions once again:

1. Which wildlife rescue groups, wildlife shelters and vets have been contacted to look after or treat any injured wildlife?
2. Do local wildlife shelters have the capacity to look after injured wildlife during this busy time of the year?
3. What arrangements have been made to financially compensate these groups?
4. What measures have been taken to install nest boxes or other artificial habitat for displaced wildlife? (Please note that installation of nest boxes needs to be carefully planned in advance so as to enable wildlife to be bonded to new nests before re-release).
5. Do the contracted ‘wildlife handlers’ have appropriate wildlife handling experience as well as knowledge of the legislation about the re-location of wildlife.
6. Do the ‘wildlife handlers’ possess the appropriate permits to have protected wildlife relocated within a safe distance from their habitat loss or will animals be euthanased?

If Melbourne Water maintain, “Protection of wildlife is of great importance to Melbourne Water and we have committed to implement the handler’s recommendations” does Melbourne Water also commit to answering our questions for the ongoing protection of wildlife who will be effected by this project?

We can only assume, from your response, that the only community engagement so far planned by Melbourne Water, is to provide wood from the felled trees to various groups to make furniture. Yet, the community groups who will be most effected like environmental groups, wildlife rescuers, wildlife carers and shelters have not been included in this process what so at all!

To indicate that you are only going to plant 30 canopy trees within Frankston, in a place yet to be identified, does not seem to be fair compensation for the loss to the local environment. How did Melbourne Water come to this conclusion? Are these trees to be planted by community volunteers or are there to be separate plantings by contractors? The AWPC has identified a number of suitable sites close by, owned by Melbourne Water for these plantings.

We look forward to your reply and answers to our questions and we at the AWPC are happy to consult with Melbourne Water and/or your ecologist consultants to work on a better plan, communication and management for the future of this project.

Yours sincerely,

Craig Thomson
President, Australian Wildlife Protection Council

LETTER TO PRESIDENT CRAIG THOMSON FROM MARK LAWRENCED, MELBOURNE WATER PROJECT MANAGER

Mr Craig Thomson
President
Australian Wildlife Protection Council Inc.
craig.awpc@gmail.com

Dear Mr Thomson
Thank you for your email enquiry regarding safety upgrade works at the Lee Street Retarding
Basin in Frankston.

We understand that you are concerned with the planned tree removal at the site and the
impact this may have on wildlife and their habitat.

Under Melbourne Water’s Statement of Obligations (2015) issued by the Minister for Water, we
are required to assess all existing retarding basins against the Australian National Committee
of Large Dams (ANCOLD) Guidelines. An assessment of the Lee Street Retarding Basin against
these guidelines identified that the site does not comply and safety upgrade works are required
to continue to reduce flood risk for the local community.

To ensure Lee Street Retarding Basin continues to operate safely and comply with the ANCOLD
guidelines, trees and vegetation on the length of the embankment will need to be removed as
part of the works. We have worked hard to ensure that we only remove trees that will affect
the integrity of the retarding basin and have committed to planting trees at other locations in
the Frankston City Council area.

The ANCOLD guidelines are publically available and a copy can be purchased online from
ANCOLD at their website: www.ancold.org.au The guidelines do not specifically mention trees
on retarding basin embankments. They provide guidance on how to assess risk on dams and
dam-like structures.

In the past, it was common practice to have trees on retarding basin embankments. However,
as international understanding of dam engineering has improved it has become evident that
trees significantly weaken embankments and increase the risk of failure in a high rainfall
event. Failure of the embankment would have a significant impact on a number of properties in
the area.

In 2015, Melbourne Water received independent specialist advice that trees on retarding basin
embankments increase the chance that the embankment may fail in the event of a large rain
event. The chance is increased due to:

 internal erosion and displacement of soil – tree roots create erosion pathways
through the embankment which are worsened when the tree dies and its
decaying roots leave voids through the embankment;

 trees uprooting and taking part of the embankment with them; and

 water speeding up around tree trunks and causing faster erosion.

As part of the works, the embankment must also be hardened to operate safely and this can’t
be done without the trees being removed.
We understand the importance of trees to the local community and have committed to
mitigating the impact of removing the embankment trees by:

 planting 30 canopy trees elsewhere in the Frankston City Council area;

 using the cut-down logs to provide a woodland habitat for wildlife at Lee Street
Retarding Basin; and

 recycling the cut down logs to make furniture that will be donated to Frankston
City Council.

A reinstatement plan has been developed in adherence to Frankston City Council’s Local Law
22 permit requirements and we will implement it in the coming months. In addition to the
reinstatement plan, wood from the trees at the site will be utilised by a local community group
and the community will also have an opportunity to participate in a planting day in Frankston
in coming months.

As part of the planning for the project, Melbourne Water engaged specialists to complete a
flora and fauna assessment and arborist assessment as part of Council’s requirements under
Local Law 22.

In your email you asked us to provide you with the arborist report and water depth and flood
modelling records. We ask you to request these under the Freedom of Information Act 1982
(Vic) to make an FOI request, please visit our website and use the online FOI application:

www.melbournewater.com.au Our FOI Officer, Michael Keough, is available to assist with your
application if required. Michael can be contacted on 9679 6821 or at
foi@melbournewater.com.au

In addition to the flora and fauna assessment we have engaged a wildlife handler who will
manage and implement the wildlife management practices prior to and during the tree removal
activity. Protection of wildlife is of great importance to Melbourne Water and we have
committed to implement the handler’s recommendations including:

 undertaking a pre-construction visual inspection and assessment at Lee Street retarding
basin. This was completed on 29 January 2018 and found no EPBC Act-listed threatened
ecological communities or FFG Act-listed threatened flora communities present within the
Lee St study site.

 marking trees that have possible habitat to ensure that they are removed appropriately.

 confirming the species as listed in the flora and fauna assessment

 remaining onsite during the tree removal works to check and safely move fauna prior to
tree removal.

The wildlife handler we have engaged is a qualified ecologist and zoologist with 25 years’
experience.

The EPA guidelines referred to are in relation to hours of work. Work for this project will be
carried out in line with EPA guidelines between 7am and 6pm Monday to Friday and 7am and
1pm on Saturdays.

Your email included concern at the sale of Melbourne Water land in the Frankston area and the
potential loss of biodiversity. We have passed this on to our Property Team who will respond to
you direct.

Once again, thank you for your email.

Yours sincerely,
Mark Lawrence
Melbourne Water Project Manager

 

ORIGINAL LETTER FROM CRAIG THOMSON TO MELBOURNE WATER ABOUT REMOVING TREES FROM LEE ST RETARDANT BASIN

Letter from Craig Thomson, President AWPC
Dated 23 January 2017.

Subject: Lee st Retarding Basin Frankston

Addressed to: David.Fairbridge@frankston.vic.gov.au (Biodiversity Officer at Frankston Council), lisa.neville@parliament.vic.gov.au (Minister for Police and Water) rbupgrades@melbournewater.com.au (email address for Melbourne Water retardant basin upgrades).

The Australian Wildlife Protection Council understands and recognise the needs to protect our communities from potential danger. We are also aware that the removal of vegetation has an impact on wildlife species. In fact it is a guarantee that wildlife will be killed during works that clear vegetation. As such we expect that every possible measure is undertaken to see if in fact clearing is necessary and if so that appropriate actions are taken and that local wildlife shelters are not left too pick up the pieces of poor planning.

We have received concern from the local community members that the threat of flooding to the local community at the Lee St retarding basin has not deemed a risk in the past and believe the proposed clearance of vegetation is excessive and will have significant impact on fauna as well as other issues, particularly of erosion and dust as well. So the Australian Wildlife Protection Council would greatly appreciate if you could answer the following questions;

-What pre-fauna surveys have been carried out and when?

-What species have been identified on site?

-What are the actions have been put into place for fauna pre, during and post construction activities for fauna?

-Which wildlife rescue groups, wildlife shelters and vets have been contacted to look after or treat any injured wildlife?

-What arrangements have been made to financially compensate these groups?

-Do local wildlife shelters have the capacity to look after injured wildlife, as they could be attending to heat stress events or bushfire effected wildlife?

-What measures have been taken to install nest boxes or other artificial habitat for displaced wildlife?

-Do they have appropriate wildlife handling permits as well as permits to have protected wildlife euthanised if injured or unable to relocate wildlife in a safe distance from their habitat loss?

-What community groups have they contacted to work with as stated in their community information sheet?  [Ref: ] “We understand the importance of trees to the local community and are committed to working closely with council, residents and community groups to develop an appropriate plan for reinstatement of trees else where in the area” in the information document provided for this project https://www.melbournewater.com.au/sites/default/files/2018-01/Communitybulletin-LeeStreet.pdf

-Where are other trees being planted, what species are to be planted and how many?

-Are offsets being provided?

-Is there an arborist report of the trees health?

-Can records of water depth be provided for the Lee St retarding basin to show threat of flooding to neighbouring properties over the years of its existence?

-Can modelling or records be provided of local flooding for once in a 40+ year storm event?

-What are the EPA regulations you are keeping to with to for this project?

-Can you provide a copy of the ANCOLD guidelines?

The Australian Wildlife Protection Council also has the understanding that you are in the process of selling off land on McClelland Dve to Ambulance Victoria for an ambulance station and another permit application has been made by Log Cabin Caravan Park. In fact we believe that all land owned by Melbourne Water from Skye Rd to Frankston/Cranbourne Rd is being considered surplus land by Melbourne Water. So it appears there are several sites across the Frankston city council municipality owned by Melbourne Water that poses a potential loss of biodiversity.

So the final question we have to you is what is Melbourne Water’s commitment to biodiversity in Frankston?

 

Share This:

AWPC Complains to Members of Parliament re Melbourne Water rush project & wildlife impact

To Lisa Neville, Lily D’Ambrosio, Paul Edbrook:
Good morning Honourable members of parliament,

Official complaint against Melbourne Water retarding basin upgrades.

I am sending you this email this morning in regards to Melbourne Water’s retarding basin upgrade in Lee St Frankston. Melbourne Water have used a very short period of time to communicate with the community about this project.

The way they have proceeded has not been open and transparent, they have used excuses of potential danger to the community without backing these claims with scientific data. When they have been approached to do so, they have communicated that we need to put in a freedom of information request (which we are in the process of doing).

We have no issues in improving infrastructure that will improve efficiency and safety to the community, as long as it is done in the guidelines of the law that does not have a negative impact on the environment, community groups and the community.

It would seem to us and members of the broader community in Frankston (who have expressed concern about wildlife welfare) are concerned with the rush to undertake this project and lack of transparency. which may in fact lead to breaches of the law and impact wildlife, local wildlife shelters. As such the Australian Wildlife Protection Council is filing this as an official complaint to you against Melbourne Water. Attached is correspondence of this project to date.
[For correspondence see “AWPC TO MELBOURNE WATER RESPONSE ON TREE REMOVAL LEE ST RETARDANT BASIN”

Share This:

Is Melbourne Water removing trees near you? What about the wildlife?

Animals are losing their trees in droves. There is a new tree removing policy for all dams and retarding basins in Victoria, treating small retarding basins as if they were big dams, and treating trees as problems, where previously they were considered desirable. See inside for locations. This policy applies in other states as well. VicRoads is also suddenly removing trees en-masse from roadsides and median strips! None of these policies gives adequate consideration to wildlife habitat or cruelty impacts. There is no overall coordinating policy for Australia to ensure the preservation of wildlife and wildlife corridors at local, state and national levels, nor to avoid heat-island creation and local climate change, or citizen despair. With constant clearing for new suburbs and roads all over habitable Australia, tree removal by governments and contractors is reaching the level of a national civil emergency.

Trees and Retarding Basins

The reason for this change of policy around retarding basins is that we have become so overpopulated, due to wilful government policy, that flooding has become a problem.

“When a natural catchment is progressively urbanised, the stormwater runoff characteristics of that catchment change accordingly.The runoff response becomes quicker and larger as the introduction of urban features (eg paved streets, tiled roofs, concrete driveways) reduces the capacity of the catchment to store and retard stormwater flow.” (Norman Himsley, “A guiding hand for flood retarding basins,” ANCOLD.)

Trees are blamed, when previously they were planted to keep the water table low, stabilise landforms, and suck up floodwater. If there has been a scientific review of the literature regarding the pros and cons of trees on dams, it has escaped me. For this reason, I am very leery of the new policy. ANCOLD is the source of the new guidelines, but you have to pay over $100 to access them, since Melbourne Water is using a private publication.

Victoria’s population growth

Victoria’s population growth – at around 2.4% is one of the fastest in the world, with a doubling time of under 30 years. Australia’s growth at 1.6% is the fastest of OECD countries. No wonder Victoria is now using the ANCOLD rules for *large dams* in order to manage small local retarding basins. These basins were adequate when they were made, before Jeff Kennett, Steve Bracks, and their successors, decided to rapidly grow Victoria’s population. (See https://candobetter.net/node/5262 and https://candobetter.net/node/5268. In Victoria, where Melbourne Water manages about 224 retarding basins, there has been a sudden onslaught of mass tree removal with very limited ‘community consultation’ and absolutely no viable plans for affected wildlife. In this article I have named some affected retarding basins. If you put them together you can see how this de-treeing policy will impact all Melbourne’s green wedges and wildlife corridors. How can anyone pretend that we can preserve Victoria’s wildlife and our pleasant green spaces if this population tsunami is allowed to go ahead?

Banyan Reserve retarding basin, Carrum Downs.
Removal of trees. Late January schedule.


https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/banyan-reserve-retarding-basin-upgrade

Campbellfield retarding basin, Sages Road, Glenroy, 80 trees to go


https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/campbellfield-creek-retarding-basin

Fairbairn Road retarding basin, Duff Street, (within the J and P Cam Reserve) at Cranbourne, tree removal

https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/fairbairn-road-retarding-basin-upgrade

Glen Valley Retarding Basin located on Glen Valley Road in Forest Hill

Lernes Street Retarding Basin located on Hylton Crescent in Forest Hill

Glen Valley retarding basin – no info here.
https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/glen-valley-retarding-basin-upgrade

Jack Roper Reserve (CSL) retarding basin in Glenroy. Tree Removal.

https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/jack-roper-reserve-retarding-basin

Masons Road retarding basin, Masons Road Reserve, Blackburn


https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/masons-road-retarding-basin-upgrade No information here. Just takes you to a Melbourne water search engine.

Navan Park retarding basin, Navan Park, off Centenary Avenue, Melton West


https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/navan-park-retarding-basin-upgrade No mention of removal of trees.

Roxburg Park retarding basin: Retarding basins at Shankland Gully (also known at St Clair Reservoir), Shankland Gully 2C, Lake Mcivor and Tiffany Crescent. Work includes removal of trees.




https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/roxburgh-park-retarding-basin-upgrades

Ryans Road retarding basin, Diamond Creek. Removal of trees.

A community bulletin was issued in November 2017. https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/ryans-road-retarding-basin-upgrade

Retarding basin located in Taylors Lakes, Chichester Drive, neighbouring to both Lake Shelduck and Lake Heron. Removal of Trees:

“trees must be removed from the whole length of the embankment.”

https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/sasses-avenue-retarding-basin-upgrade

Troups Creek West Wetland and Hallam Bypass retarding basin on Drysdale Avenue in Narre Warren North. Tree removal.

“Vegetation removal from the wetland; this will be replaced with plants that will improve the natural treatment of stormwater”
https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/troups-creek-west-wetland-upgrade

Yarraman Creek retarding basin, Elonera Road, Noble Park North. Removal of trees.


Undated community bulletin indicating works would have started on Monday 22 January 3pm – 4pm.
https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/yarraman-creek-retarding-basin-upgrade

Christmas Hills land-sale. Melbourne water selling off public land previously earmarked for the Watsons Creek Storage Reservoir, which it says it no longer needs. There was some ‘community consultation’, but this land is going to be turned into a suburb.

https://yoursay.melbournewater.com.au/christmas-hills-land-sale

RECENT PAST WORKSThompsons Road retarding basin, Lawson Poole Reserve in Cranbourne. Trees were removed. https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/thompsons-road-retarding-basin-upgrade

Trees have been removed. There is a community information bulletin here: https://www.melbournewater.com.au/sites/default/files/Communitybulletin-EastBurwood-May2017.pdf The following link leads nowhere useful: https://www.melbournewater.com.au/what-we-are-doing/works-and-projects-near-me/all-projects/east-burwood-retarding-basin-upgrade

Several more if you do a search for Melbourne Water and retarding basins.